Advanced Use Cases
This section provides some examples of how you can use Unlimited Subitems to extend the native monday.com hierarchy.
Change the size of a column
By default, Unlimited Subitems loads your boards with column sizes matching those in the Main Table (for items and subitems) and the Storage Board (for USI items).
You can adjust column sizes in the Unlimited Subitems view, but these changes are not saved. When you reopen the app, the columns will revert to their default sizes.
To make column size changes permanent, adjust the column size directly in the Storage Board or the Main Table.
Reorder items
By default, Unlimited Subitems loads items in the same order as they appear in the Main Table and the Storage Board. To reorder items, you must change the order directly in either the Main Table or the Storage Board.
We're working on enabling item reordering directly from the Storage Board to make this process even easier.
Roll up values from third-level USI items to the top parent
You can roll up the status of your third-level items to use them for reporting purposes. To do so, follow these steps:
- Ensure that you have the same type of columns available on all levels (e.g., hours)
- Open the Storage Board of that board.
- Create a Connect boards column in the Storage Board and connect it with your main board. Name this column Top parent.
- Go back to your main board. Add a Connect boards column to the storage board and call it Top parent item. When creating this column, ensure that you select the option Create a two-way connection.
- Return to the Storage Board. You should now see a new column called Link to Subitems of <board name>. Rename that column to Child of.
- Link the immediate parent item in the Child of column.
- Return to the main board. On the subitem level, create a new mirror column and connect it with Top parent item.
- On the top parent item (item level), on the mirrored column, select Show Summary.
Add a Gantt view
You can create a Gantt view that includes all the subitems created using Unlimited Subitems, making it easier to understand and visualise them within your project timeline. Follow these steps to create a Gantt view that includes unlimited subitems:
Open a view with an item's ID
You can add an item's ID as a parameter in your board's URL to open your Unlimited Subitem view with the tree expanded and focused on that item.